Planning_Applications_1600x400

Make a Planning Application

Make a Planning Application

Make a Planning Application

ALL documentation submitted with a planning application forms part of the application and will be included in both the hard copy of the file which the Council is obliged to make available for public inspection and the copy available on the Council’s website (www.sdcc.ie) 

Caution should therefore be exercised when submitting documentation with your planning application that you may not wish to have publicly available.

How Do I Make a Planning Application?

To obtain planning permission, the applicant must make a planning application. Applications can be made for different categories of permission—including:

  • Outline Permission
  • Permission (standard / full permission)
  • Retention Permission
  • Permission consequent to the grant of Outline Permission
  • Alteration to an existing Permission

Standard permission (often referred to as full permission) is the most common type of application.

Can I apply for Planning Permission online?

Yes. You can apply for planning permission online through the National Online Planning PortalPlanning System | Local Government Ireland Planning System

Information about how to use the site is available at the following links:

Microsoft Word - LGMA FAQs.docx

Microsoft Word - LGMA User Guide.docx

Can I Consult with the Planning Authority in advance?

Yes. This is referred to as a pre-planning consultation and can be requested by phone, in writing, or by email. The applicant should provide:

  • Name and address
  • Contact details
  • Site address
  • Site location map (e.g. 1:2500 scale showing the proposed site outline)
  • Approximate size of the site
  • Legal interest in the site (e.g. owner/purchaser or relevant consent status)
  • Description of the proposed development

Once this information is submitted, the request is routed to the relevant area planner to arrange an appointment.

Can I employ an Agent to apply for Permission on my behalf?

Yes. Many applicants use an architect, planning consultant, or agent to manage the application in its entirety, or engage a designer/architect to prepare plans and drawings while lodging the application themselves.

What must I do to make a Valid Application?

Under the Planning and Development Act 2024 and the 2026 Regulations, you must submit the required application package - ensuring forms and notices cite the 2024 Act, including:

  • Completed Application Form (updated 2024 Act / 2026 Regulations form)
  • Correct Fee — failing to pay the correct fee will result in the application being declared invalid.
  • Site Notice (erected within the statutory window before lodgement and complying with 2024 Act notice rules)
  • Newspaper Notice (published in an approved newspaper within the statutory window before lodgement)
  • Documentary Proof of Entitlement / Consent — evidence of ownership or the owner’s written consent to make the application
  • Site Location Map
  • Plans / Drawings

What should the Documents submitted with my application show?

Social and Affordable Housing Certificate

Before applying for planning permission on residentially zoned land or mixed-use land including residential development, applicants should ensure they have applied for or obtained any required Certificate of Exemption (or housing/part-compliance documentation) where an exemption from social and affordable housing obligations applies under the statutory framework.

Site Location Map

  • Must be clearly marked or coloured to identify the land or structure to which the application relates and its boundaries.
  • Should be based on an Ordnance Survey map with the map number clearly indicated.
  • Scale should generally be not less than 1:1000 in urban areas and 1:2500 in rural/other areas.

Site / Layout Map & Drawings

  • Except for Outline Permission, plans and drawings should include detailed drawings (floor plans, elevations, sections, and other necessary particulars) describing the works or structure.
  • Typically drawn to a scale not less than 1:200.

Public / Site Notice

  • A copy of the site notice must be submitted with the application and kept in place on site for 5 weeks from receipt of the application.
  • Under the 2024 Act framework, notices must be given within the required pre-lodgement window (within two weeks before lodgement), and if a site notice becomes illegible or is removed during the public consultation period, it must be replaced immediately so the application is not invalidated.
  • The site notice should be positioned at the entrance to the private road where it meets the public road and/or at the site entrance so it is clearly visible to the public.
  • Where a proposed development falls under Renewable Energy Directive III (Directive (EU) 2023/2413) (RED III), the applicable RED III Site Notice must be used.

Site Layouts, Plans, Maps and Drawings – Scale & Contiguous Features

  • The same scale must be used across the entirety of any individual map or drawing submitted under the applicable planning regulations.
  • Where a structure or feature is contiguous to the proposed development (adjoining, touching, or sharing a common boundary), it must be shown with the same level of accuracy as if within the red-line site boundary.

Newspaper Notice

  • A copy or original of the newspaper notice must be submitted with the application, and the application must be lodged with the Planning Department within two weeks of the newspaper publication date (using an approved newspaper for the area).
  • All notices must include:
    • as a heading, the name of the Planning Authority and the name of the applicant;
    • the nature of the application (e.g. outline permission, permission, retention permission, permission consequent on outline permission, or alteration of an existing permission);
    • the location, townland, or postal address of the land or structure;
    • a brief description of the development; and
    • a statement that the application may be inspected or purchased (at a fee not exceeding the reasonable cost of copying) at the Planning Authority’s offices during public opening hours (and/or viewed online), and that written submissions or observations may be made to the Planning Authority on payment of the prescribed fee within 5 weeks beginning on the date of receipt of the application;
    • in the case of a newspaper notice relating to an application for permission for small-scale solar equipment development or development that is the installation of a small-scale non-ground source heat pump, this period shall be 2 weeks.

Is Same Day Validation available?

Yes.  Same Day Validation is available for certain types of applications.  This service is available every Wednesday from 10:00 a.m. to 12:30 p.m. 

Same Day Validation - SDCC

Once an Application is received by the Planning Department, what happens next?

Standard planning applications follow a statutory decision timeline (typically 8 weeks for standard applications, subject to statutory extensions/rules under the 2024 Act and 2026 Regulations):

  • Validation Check: Upon receipt, the application is checked for validity (correct forms, fees, notices, ownership/consent proof, and required documents). Invalid applications—including those using outdated 2000 Act forms/notices from 26 November 2026 onward or defective notices—are returned/invalidated.
  • Site Notice Inspection: The site notice must remain up and legible for the 5-week public consultation period; planners may inspect the site during this period.
  • Public Submissions: Written submissions or observations are accepted within 5 weeks from the date of receipt of the application, or within 2 weeks where the application relates to small-scale solar energy equipment or small-scale non-ground-source heat pumps.
  •  
  • Assessment & Report: Following the submission window, the planning officer assesses the application against the development plan, proper planning and sustainable development, and submissions, preparing a written report and recommendation.
  • Decision: The decision is made at the appropriate authorised level and issued (typically within the 8-week statutory period, unless extended in accordance with the 2024 Act—such as where Further Information is requested or a statutory extension applies).
  • Further Information (FI): Under the 2024 Act regime, requests for Further Information are subject to stricter limits (generally a single FI request within the initial 8-week period on standard applications, limited to unforeseen matters, new issues raised in submissions, or verifying material provided, with a 6-month window to respond).
  • Grant of Permission: If permission is granted and no valid appeal is lodged within 4 weeks of the decision date, the Planning Authority proceeds to issue the formal grant of permission.
  • Appeals & Leave to Appeal to An Coimisiún Pleanála: Decisions can be appealed to An Coimisiún Pleanála within 4 weeks from the decision date, subject to statutory eligibility and fee rules (including leave-to-appeal rules where applicable for persons with an interest in adjoining land).

Submissions / Observations & Defamation Notice

Any person or body, on payment of the prescribed fee, may make a submission or observation in writing to the Planning Authority within 5 weeks beginning on the date of receipt of the application, or within 2 weeks where the application relates to small-scale solar energy equipment or small-scale non-ground-source heat pumps (subject to statutory format/submission rules under the 2024 Act and 2026 Regulations).

Defamation Notice: Anyone making a submission or observation should be aware that statements or allegations directed at a named or identifiable person or organisation may be considered defamatory. Submitters may face direct legal action for defamatory remarks and should avoid making such allegations. All submissions/observations form part of the public file (hard copy and online via the Council’s website), and if a potentially defamatory statement leads to legal proceedings against the Planning Authority, the authority may seek indemnity from the person who made the statement.

Note: This update reflects the transition to the Planning and Development Act 2024 and 2026 Regulations around the 26 November 2026 commencement date and is for general informational purposes rather than legal advice. Always check South Dublin County Council’s latest forms, notices, and validation checklists on sdcc.ie before lodging.