Wellington Cycling and Walking Scheme
Wellington Cycling and Walking Scheme
Wellington Cycle Scheme Phase A Detailed design is currently being finalized and is set to begin construction in Q4 2026.
The Wellington Road Cycling and Walking Scheme Part 8 Consultation commenced 08/09/2022 and has ended 28/10/2022.
You can still view the details of the Part 8 Consultation Here
A previous Public Consultation commenced from 14/12/2021 and ended 31/01/2022.
You can still view the details here
The EIA and AA screening decision was taken on 11th August 2022 and recorded on the SDCC Chief Executive Order system.
Copies of these decisions are available on request from activetravel@SDUBLINCOCO.ie
Rossmore Road Trial
As a part of this scheme, a trial scheme was set up on Rossmore Road to monitor the reaction to Active Travel implementations.
This trial consisted of:
- A 2-way cycle track on Rossmore Road.
- junction tightening at Rossmore Drive, Rossmore Grove and Rossmore Crescent.
This trial received positive reception with 54% of cyclists feeling safer cycling on Rossmore Road post construction of this scheme. For more details on this trial and results from its consultation with the public please see here.